Visit the MAI

Visit the MAI2023-02-01T14:55:04+01:00

Deprecated: Function wp_make_content_images_responsive is deprecated since version 5.5.0! Use wp_filter_content_tags() instead. in /srv/data/web/vhosts/themai.org/htdocs/wp-includes/functions.php on line 5383

History

The MAI building was built in line with EDF’s commitment to sustainable industrial growth and in compliance with the highest environmental quality standards. It features high performance heat pumps using geothermal technology, double air flow with variable flow recovery, CO2 sensors to automatically adjust air recycling, rainwater recycling and low luminance lighting with detectors for the presence of people… all of which bringing an almost 80% reduction in overall energy consumption. Enjoy also a lab tour of EDF’s facilities on aging of materials, some of them being unique in the world : Research capabilities for Long Term Operation – The MAI .

See gallery2020-12-22T10:55:03+01:00